NPV vs IRR vs Payback: Capital Budgeting Made Simple

By SimplyCPA · 24 October 2026

Text size
On this page (5)
  1. NPV: Present value of cash inflows minus the investment, at the required rate of return. Accept if NPV is positive.
  2. IRR: The discount rate that makes NPV zero. Accept if IRR exceeds the required rate.
  3. Payback: How long it takes to recover the investment in undiscounted cash — simple, but ignores the time value of money and later cash flows.
  4. Profitability index: PV of inflows ÷ investment; useful for ranking projects when capital is limited.
  5. When they conflict: For mutually exclusive projects, NPV is the better guide.

The question capital budgeting answers

Should a company spend money now to receive cash later? Because money has a time value, cash flows years apart can't simply be added up — they have to be discounted at the company's required rate of return (often its cost of capital).

One project, four measures

A project costs $10,000 today and returns $4,500 at the end of each of the next 3 years. Required rate of return: 10% (3-year ordinary annuity factor at 10% = 2.48685).

  • Net present value (NPV) — PV of inflows = $4,500 × 2.48685 = $11,190.83. NPV = $11,190.83 − $10,000 = $1,190.83. Positive, so the project earns more than 10%.
  • Internal rate of return (IRR) — the rate at which NPV is zero, i.e. where the annuity factor equals $10,000 ÷ $4,500 = 2.2222. That's between 16% (2.2459) and 17% (2.2096): about 16.7%. It exceeds 10%, so accept.
  • Payback period — $4,500 + $4,500 = $9,000 after 2 years; the remaining $1,000 takes $1,000 ÷ $4,500 = 0.22 of year 3. Payback ≈ 2.22 years.
  • Profitability index (PI) — $11,190.83 ÷ $10,000 = 1.12. Above 1 means a positive NPV.

Strengths and weaknesses

MethodStrengthWeakness
NPVMeasures the value added in dollars; uses all cash flows and the time value of moneyNeeds a required rate; harder to explain than a percentage
IRRAn intuitive percentage returnAssumes cash is reinvested at the IRR; can give multiple answers when cash flows change sign more than once; can rank projects wrongly
PaybackSimple; a rough measure of liquidity riskIgnores the time value of money (unless discounted payback is used) and anything after the payback date
PIRanks projects when capital is rationedLike IRR, a ratio can favour small projects

NPV assumes cash flows are reinvested at the required rate, which is usually more realistic than the IRR's assumption. That's why, when two mutually exclusive projects rank differently under NPV and IRR, NPV is preferred.

Practice MCQs

1. A project's IRR is 12% and the company's required rate of return is 14%. Its NPV at 14% is:
(A) Positive (B) Zero (C) Negative (D) Impossible to tell
Answer: C. Discounting at a rate above the IRR gives a negative NPV.

2. Which method ignores cash flows that arrive after the investment has been recovered?
(A) NPV (B) IRR (C) Payback (D) Profitability index
Answer: C.

Related BAR coverage: financial forecasting and projections and our time value of money explainer.