  1. Costing systems: Job order costing for unique jobs; process costing for continuous, identical units; activity-based costing allocates overhead using the activities that drive cost.
  2. Absorption vs variable costing: Absorption includes fixed manufacturing overhead in inventory; variable costing expenses it. Income differs when inventory levels change.
  3. Material variances: Price = AQ × (AP − SP); quantity = SP × (AQ − SQ).
  4. Labour variances: Rate = AH × (AR − SR); efficiency = SR × (AH − SH).
  5. Reading variances: Favourable isn't always good — a favourable price variance from cheap, poor-quality materials can cause an unfavourable quantity variance.

Where it's tested

Cost accounting, budgeting and variance analysis sit in Area I (Business Analysis) of the Business Analysis and Reporting (BAR) Discipline. Expect calculations and interpretation in both multiple-choice questions and simulations.

Costing systems

  • Job order costing — costs accumulated by job (custom furniture, audits, construction). Overhead applied using a predetermined rate.
  • Process costing — costs accumulated by department and spread over equivalent units (refining, beverages). Weighted-average and FIFO methods differ in how they treat opening work in process.
  • Activity-based costing (ABC) — overhead assigned through activity cost pools (set-ups, inspections, orders) using cost drivers. More accurate when products consume overhead differently.

Absorption vs variable costing

Absorption (required for GAAP and tax)Variable (internal use)
Fixed manufacturing overheadProduct cost (in inventory)Period cost (expensed)
Production > salesHigher incomeLower income
Production < salesLower incomeHigher income

The income difference = change in inventory units × fixed overhead per unit.

Standard cost variances: worked example

Standard: 2 kg of material at $5/kg and 0.5 hours of labour at $20/hour per unit. Actual output 1,000 units, using 2,100 kg bought at $4.80/kg, and 520 labour hours at $21/hour.

VarianceFormulaCalculationResult
Material priceAQ × (AP − SP)2,100 × ($4.80 − $5.00)$420 F
Material quantitySP × (AQ − SQ)$5 × (2,100 − 2,000)$500 U
Labour rateAH × (AR − SR)520 × ($21 − $20)$520 U
Labour efficiencySR × (AH − SH)$20 × (520 − 500)$400 U

(F = favourable, U = unfavourable. Standard quantities are for actual output: 1,000 × 2 kg = 2,000 kg; 1,000 × 0.5 = 500 hours.)

Interpretation: cheaper material saved $420 but caused $500 of extra usage — possibly lower quality. That may also explain the extra labour hours.

Overhead variances

  • Variable overhead spending = actual variable overhead − (actual hours × standard rate).
  • Variable overhead efficiency = standard rate × (actual hours − standard hours allowed).
  • Fixed overhead budget (spending) = actual fixed overhead − budgeted fixed overhead.
  • Fixed overhead volume = budgeted fixed overhead − fixed overhead applied (standard hours allowed × fixed rate). It reflects capacity use, not cost control.

Flexible budgets

Compare actual results with a budget flexed to the actual level of activity, not the original static budget. The static-to-flexible difference is the sales volume variance; the flexible-to-actual difference is the flexible budget variance, which the price and efficiency variances above break down.